Cost information
In the construction industry the term ‘cost’ generally refers to the amount that has to (or will have to) be paid to receive goods or services. Different types of cost include capital costs, construction costs, operational costs, whole-life costs, environmental costs, social costs and so on.
Cost information is an important element across several activities that are involved in cost engineering (the practice of managing costs involved on a construction project), such as cost control, budgeting, forecasting, estimating, investment appraisal and risk analysis. It is also used to help measure profit margins, value assets and make decisions.
The type of cost information will depend on the particular type of costs that are being managed.
In relation to construction costs, cost information can be used to help set prices, which are typically the actual cost plus a percentage to allow for profit.
In the context of estimating construction or capital costs, cost information should be aligned with the project budget and can be set out in cost plans. These are generally prepared by cost consultants (often quantity surveyors) and evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by specialist contractors, contractors and suppliers.
Types of cost plan include:
- Initial cost appraisal (studies of options prepared during the feasibility study stage).
- Elemental cost plan (prepared during the project brief stage and carried through to detailed design).
- Approximate quantities cost plan (from the end of detailed design through to tender).
- Pre-tender estimate (prepared alongside tender documentation).
- Tender pricing document (strictly speaking this is not a priced document, but is part of the tender documentation issued to the contractor for pricing).
- Contract sum (agreed with the contractor during the tender period and adjusted during the construction period).
- Contract sum analysis (a break down of the contract sum prepared by the contractor on design and build projects).
- Final account (agreed during the defects liability period).
For more information see: Cost plan.
Cost reporting is the process of providing a client (or other party) with information about the magnitude of a project’s predicted, or actual cost. This can be expressed either in absolute terms or as a variance compared to the project budget. Cost reports are typically prepared by a cost consultant (such as a quantity surveyor) and updated regularly (perhaps monthly), to keep the client informed and to help them and the project team control costs.
BCIS is the Building Cost Information Service of the Royal Institution of Chartered Surveyors (RICS). Cost and price information is collected by BCIS from across the UK construction industry, then collated, analysed, modelled, interpreted and made available to the industry to facilitate accurate cost planning.
For more information see: BCIS
NB The RIBA Plan of Work 2013 defines cost information as: 'All of the project costs, including the cost estimate and life cycle costs where required.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.